BioEnergy, Fuel handling for power
Nässjö - 12MW Hot Water
The facility at Nässjö Affärsverk was installed to provide the summer heating requirements and meet the additional winter load with the use of the existing facility.
Case study
Norraskogsägarna, 10 MW Hot Water
The facility at Nässjö Affärsverk was installed to provide the summer heating requirements and meet the additional winter load with the use of the existing facility. The facility is equipped with a flue gas condenser to handle peak fuel loads to biofuels is 35‐50% moisture content.
Technical data
Client |
Nässjö Affärsverk |
---|---|
Year |
2008 |
Location |
Nässjö, Sweden |
Business |
District Heating |
Power |
Biofuel Boiler 12 MW hot water |
Veröffentlicht
3rd Juli 2019