One Sludge Cake Truck Reception Bunker fitted with Saxlund Push Floor Discharger into two Saxlund Piston Pumps.
Case study
Sewage sludge incineration plant at the WWTP Karlsruhe
The city of Karlsruhe operates fluid bed incineration for municipal sewage sludge in their wastewater treatment plant. In addition to the internal sludge im- ported sludge is taken from other sewage plants.
Already in 2002 Saxlund had de- livered the first plant for the sludge handling. By increasing the capacity of the incineration, a second receiving station is installed.
For loading of the reception silo, a hydraulically operated cover on the road level has to open. The push floor and the prepress screw installed directly under the silo bottom feed the solids-handling pump. For charging the two fluid beds a Saxlund distribution is used.
Due to a pipeline length of 100 m, lubrication is essential. The pipeline pressure is reduced approx. 40 % by the water injection.
Diese Website verwendet Cookies, um Ihnen das beste Erlebnis zu bieten. Durch die weitere Nutzung dieser Website stimmen Sie unseren Cookie-Richtlinie.