3.7MW Certus Unit for Gnosjö, Småland, Sweden
Case Study
3MW Certus Unit plus 0.7MW from flue gas condenser for Gnosjö, Småland, Sweden
Saxlund we awarded the contract to install a 3MW Certus Unit plus a 0.7MW Saxlund flue gas condenser for Gnosjö, Småland, Sweden. The fuel for the plant was wet wood chips, up to 50% moisture content. The contract included the fuel handling system which included a Saxlund Push Floor and screw conveyor
Published
1st November 2022
Author
Matt Drew