Chain conveyor, Fuel handling for power, Push floor

Biomass Co-Firing Didcot Power Station

Saxlund International UK won the contract to supply a biomass handling system for the new biomass co-combustion system at Didcot Power Station in Oxfordshire.

Case study

Didcot Power Station

Saxlund International UK won the contract to supply a biomass handling system for the new biomass co-combustion system at Didcot Power Station in Oxfordshire.

The scheme incorporated a Saxlund Push Floor system and a large chain conveyor designed to handle a wide variety of biomass fuel materials between a wide range of feed rates. The system is designed with a live capacity of 500m3 which is maintained at an average height of 4m by mobile plant from the static stockpiles of material within the storage building.

The material is discharged on demand by the reciprocating action of the Push Floor elements and falls into the lower strand of the Saxlund Scraper Chain Conveyor, which itself discharges the material onto a belt conveyor.

Technical data

Client

Year

2006

Power Station Output

1500MWe

Discharge Rate

60 - 300 m³/hr (materials 1,2 & 4)
Ash discharge rate 120 m³/hr

Material

Material 1: Sawdust

Size

3mm to dust

Moisture

2 - 50%

Bulk density

200 - 300 kg/m³

Filling Height

4m

  

Material 2: Wood Pellets

Size

< 30mm

Moisture

2-15%

Bulk density

500 - 750 kg/m³

Filling Height

3.6m max

  

Material 3: Conditioned Ash

Size

3mm to dust

Moisture

15 - 25%

Bulk density

1000 kg/m³

Filling Height

2.5m max

  

Material 4: Palm Kernels

Size

8mm to dust

Moisture

7 - 12%

Bulk density

600 - 700 kg/m³

Filling Height

3.9m max

Equipment

Push Floor Machine

Type

ZB-280-6x1389x15155

Dimensions

6 no. element field
8.3m (W x 15.1m (L)

Average Filling Height

4m

Storage Capacity

500m³

  

Levelling Screw

Type

KA 500

Dimensions

8.3m (L) x dia. 500mm

  

Discharge Chain Conveyor

Type

TKF-1550-HBL

Dimensions

1.55m (w) x 21m (L)

Inclination

0° / 31°